vimg::0

NIMBLE 15FT Waterproof Dog Training Leash - Heavy Duty Recall Long Lead for Large Medium Small Dogs (Purple)

10FT / Transparent Green
£29.54
Sale price  £29.54 Regular price 
Skip to product information
vimg::0

NIMBLE 15FT Waterproof Dog Training Leash - Heavy Duty Recall Long Lead for Large Medium Small Dogs (Purple)

£29.54
Sale price  £29.54 Regular price 
Size
Color

The NIMBLE Waterproof Dog Training Leash is a 15-foot long lead designed for recall training, outdoor adventures, and everyday walks. Made from PVC-coated nylon webbing, it stays lightweight and strong even when wet, and resists odors. With a 600 lbs pull force resistance, it provides a secure grip for dogs of all sizes. Available in multiple colors and lengths, this leash is ideal for hiking, camping, beach trips, and obedience work.

What size and color options are available?

This specific leash is 15 feet long and comes in purple. The leash width is 0.4 inches. Other lengths (5FT, 10FT, 30FT, 50FT) and multiple colors are offered by the brand, so you can choose what fits your dog best.

Key details about the material and durability

  • Material: PVC-coated nylon webbing – lightweight, weatherproof, easy to clean, and anti-odor.
  • Strength: 600 lbs pull force resistance for reliable control.
  • Length: 15 feet (180 inches) with a 0.4-inch width.
  • Brand: NIMBLE – model number: dog leash.

Technical specifications at a glance

Brand NIMBLE
Color Purple
Material Nylon (PVC coated)
Size 15FT
Product Dimensions 180"L x 0.4"W
Pull Force Resistance 600 lbs
Item Model Number dog leash
Date First Available June 5, 2022

Frequently asked questions

Is the leash suitable for large dogs?

Yes, with a 600 lbs pull force resistance and a width of 0.4 inches, it is designed to handle large, strong dogs. The coating also provides a comfortable grip.

Can this leash be used in water?

Yes, the PVC-coated nylon webbing is waterproof and remains lightweight even when wet. It is also anti-odor and easy to clean after use in lakes, rivers, or the ocean.

How do I clean the leash?

Simply wipe it down with a damp cloth or rinse with fresh water. The smooth coating resists dirt and odors.

What is the difference between the 15FT and other lengths?

The 15FT version gives a balance of control and freedom for recall training, while longer lengths like 30FT or 50FT offer more range for open spaces. The 5FT and 10FT are better for close-quarters walks.

Why choose a 15-foot training leash?

A 15-foot lead gives your dog room to explore during training while still allowing you to maintain control. It is long enough for recall exercises, yet short enough to avoid tangles. The purple color is highly visible in outdoor settings. Whether you are working on obedience, hiking trails, or enjoying a day at the beach, this leash is built to last.

You may also like