{"product_id":"nimble-15ft-waterproof-dog-training-leash-heavy-duty-recall-long-lead-for-large-medium-small-dogs-purple","title":"NIMBLE 15FT Waterproof Dog Training Leash - Heavy Duty Recall Long Lead for Large Medium Small Dogs (Purple)","description":"\u003cp\u003eThe NIMBLE Waterproof Dog Training Leash is a 15-foot long lead designed for recall training, outdoor adventures, and everyday walks. Made from PVC-coated nylon webbing, it stays lightweight and strong even when wet, and resists odors. With a 600 lbs pull force resistance, it provides a secure grip for dogs of all sizes. Available in multiple colors and lengths, this leash is ideal for hiking, camping, beach trips, and obedience work.\u003c\/p\u003e\n\n\u003ch2\u003eWhat size and color options are available?\u003c\/h2\u003e\n\u003cp\u003eThis specific leash is 15 feet long and comes in purple. The leash width is 0.4 inches. Other lengths (5FT, 10FT, 30FT, 50FT) and multiple colors are offered by the brand, so you can choose what fits your dog best.\u003c\/p\u003e\n\n\u003ch2\u003eKey details about the material and durability\u003c\/h2\u003e\n\u003cul\u003e\n\u003cli\u003e\n\u003cstrong\u003eMaterial:\u003c\/strong\u003e PVC-coated nylon webbing – lightweight, weatherproof, easy to clean, and anti-odor.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eStrength:\u003c\/strong\u003e 600 lbs pull force resistance for reliable control.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eLength:\u003c\/strong\u003e 15 feet (180 inches) with a 0.4-inch width.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eBrand:\u003c\/strong\u003e NIMBLE – model number: dog leash.\u003c\/li\u003e\n\u003c\/ul\u003e\n\n\u003ch2\u003eTechnical specifications at a glance\u003c\/h2\u003e\n\u003ctable\u003e\n\u003ctr\u003e\n\u003ctd\u003eBrand\u003c\/td\u003e\n\u003ctd\u003eNIMBLE\u003c\/td\u003e\n\u003c\/tr\u003e\n\u003ctr\u003e\n\u003ctd\u003eColor\u003c\/td\u003e\n\u003ctd\u003ePurple\u003c\/td\u003e\n\u003c\/tr\u003e\n\u003ctr\u003e\n\u003ctd\u003eMaterial\u003c\/td\u003e\n\u003ctd\u003eNylon (PVC coated)\u003c\/td\u003e\n\u003c\/tr\u003e\n\u003ctr\u003e\n\u003ctd\u003eSize\u003c\/td\u003e\n\u003ctd\u003e15FT\u003c\/td\u003e\n\u003c\/tr\u003e\n\u003ctr\u003e\n\u003ctd\u003eProduct Dimensions\u003c\/td\u003e\n\u003ctd\u003e180\"L x 0.4\"W\u003c\/td\u003e\n\u003c\/tr\u003e\n\u003ctr\u003e\n\u003ctd\u003ePull Force Resistance\u003c\/td\u003e\n\u003ctd\u003e600 lbs\u003c\/td\u003e\n\u003c\/tr\u003e\n\u003ctr\u003e\n\u003ctd\u003eItem Model Number\u003c\/td\u003e\n\u003ctd\u003edog leash\u003c\/td\u003e\n\u003c\/tr\u003e\n\u003ctr\u003e\n\u003ctd\u003eDate First Available\u003c\/td\u003e\n\u003ctd\u003eJune 5, 2022\u003c\/td\u003e\n\u003c\/tr\u003e\n\u003c\/table\u003e\n\n\u003ch2\u003eFrequently asked questions\u003c\/h2\u003e\n\u003ch3\u003eIs the leash suitable for large dogs?\u003c\/h3\u003e\n\u003cp\u003eYes, with a 600 lbs pull force resistance and a width of 0.4 inches, it is designed to handle large, strong dogs. The coating also provides a comfortable grip.\u003c\/p\u003e\n\u003ch3\u003eCan this leash be used in water?\u003c\/h3\u003e\n\u003cp\u003eYes, the PVC-coated nylon webbing is waterproof and remains lightweight even when wet. It is also anti-odor and easy to clean after use in lakes, rivers, or the ocean.\u003c\/p\u003e\n\u003ch3\u003eHow do I clean the leash?\u003c\/h3\u003e\n\u003cp\u003eSimply wipe it down with a damp cloth or rinse with fresh water. The smooth coating resists dirt and odors.\u003c\/p\u003e\n\u003ch3\u003eWhat is the difference between the 15FT and other lengths?\u003c\/h3\u003e\n\u003cp\u003eThe 15FT version gives a balance of control and freedom for recall training, while longer lengths like 30FT or 50FT offer more range for open spaces. The 5FT and 10FT are better for close-quarters walks.\u003c\/p\u003e\n\n\u003ch2\u003eWhy choose a 15-foot training leash?\u003c\/h2\u003e\n\u003cp\u003eA 15-foot lead gives your dog room to explore during training while still allowing you to maintain control. It is long enough for recall exercises, yet short enough to avoid tangles. The purple color is highly visible in outdoor settings. Whether you are working on obedience, hiking trails, or enjoying a day at the beach, this leash is built to last.\u003c\/p\u003e","brand":"NIMBLE","offers":[{"title":"10FT \/ Transparent Green","offer_id":46990580580540,"sku":null,"price":29.54,"currency_code":"GBP","in_stock":true},{"title":"10FT \/ Blue","offer_id":46990580613308,"sku":null,"price":29.54,"currency_code":"GBP","in_stock":true},{"title":"30FT \/ Blue","offer_id":46990580646076,"sku":null,"price":29.54,"currency_code":"GBP","in_stock":true},{"title":"50FT \/ Pink","offer_id":46990580678844,"sku":null,"price":29.54,"currency_code":"GBP","in_stock":true},{"title":"10FT \/ Orange","offer_id":46990580711612,"sku":null,"price":29.54,"currency_code":"GBP","in_stock":true},{"title":"15FT \/ Orange","offer_id":46990580744380,"sku":null,"price":29.54,"currency_code":"GBP","in_stock":true},{"title":"10FT \/ Black","offer_id":46990580777148,"sku":null,"price":29.54,"currency_code":"GBP","in_stock":true},{"title":"5FT \/ Mint Green","offer_id":46990580809916,"sku":null,"price":29.54,"currency_code":"GBP","in_stock":true},{"title":"15FT \/ Black","offer_id":46990580842684,"sku":null,"price":29.54,"currency_code":"GBP","in_stock":true},{"title":"50FT \/ Blue","offer_id":46990580875452,"sku":null,"price":29.54,"currency_code":"GBP","in_stock":true},{"title":"15FT \/ Transparent Green","offer_id":46990580908220,"sku":null,"price":29.54,"currency_code":"GBP","in_stock":true},{"title":"15FT \/ Pink","offer_id":46990580940988,"sku":null,"price":29.54,"currency_code":"GBP","in_stock":true},{"title":"50FT \/ Mint Green","offer_id":46990580973756,"sku":null,"price":29.54,"currency_code":"GBP","in_stock":true},{"title":"50FT \/ Orange","offer_id":46990581006524,"sku":null,"price":29.54,"currency_code":"GBP","in_stock":true},{"title":"15FT \/ Purple","offer_id":46990581039292,"sku":null,"price":29.54,"currency_code":"GBP","in_stock":true},{"title":"10FT \/ Mint Green","offer_id":46990581072060,"sku":null,"price":29.54,"currency_code":"GBP","in_stock":true},{"title":"50FT \/ Transparent Green","offer_id":46990581104828,"sku":null,"price":29.54,"currency_code":"GBP","in_stock":true},{"title":"30FT \/ Purple","offer_id":46990581137596,"sku":null,"price":29.54,"currency_code":"GBP","in_stock":true},{"title":"5FT \/ Blue","offer_id":46990581170364,"sku":null,"price":29.54,"currency_code":"GBP","in_stock":true},{"title":"15FT \/ Light Yellow","offer_id":46990581203132,"sku":null,"price":29.54,"currency_code":"GBP","in_stock":true},{"title":"50FT \/ Purple","offer_id":46990581235900,"sku":null,"price":29.54,"currency_code":"GBP","in_stock":true},{"title":"15FT \/ Mint Green","offer_id":46990581268668,"sku":null,"price":29.54,"currency_code":"GBP","in_stock":true},{"title":"30FT \/ Pink","offer_id":46990581301436,"sku":null,"price":29.54,"currency_code":"GBP","in_stock":true},{"title":"5FT \/ Purple","offer_id":46990581334204,"sku":null,"price":29.54,"currency_code":"GBP","in_stock":true},{"title":"10FT \/ Purple","offer_id":46990581366972,"sku":null,"price":29.54,"currency_code":"GBP","in_stock":true},{"title":"5FT \/ Pink","offer_id":46990581399740,"sku":null,"price":29.54,"currency_code":"GBP","in_stock":true},{"title":"10FT \/ Light Yellow","offer_id":46990581432508,"sku":null,"price":29.54,"currency_code":"GBP","in_stock":true},{"title":"10FT \/ Pink","offer_id":46990581465276,"sku":null,"price":29.54,"currency_code":"GBP","in_stock":true},{"title":"15FT \/ Blue","offer_id":46990581498044,"sku":null,"price":29.54,"currency_code":"GBP","in_stock":true},{"title":"50FT \/ Light Yellow","offer_id":46990581530812,"sku":null,"price":29.54,"currency_code":"GBP","in_stock":true},{"title":"50FT \/ Black","offer_id":46990581563580,"sku":null,"price":29.54,"currency_code":"GBP","in_stock":true},{"title":"30FT \/ Orange","offer_id":46990581596348,"sku":null,"price":29.54,"currency_code":"GBP","in_stock":true},{"title":"30FT \/ Black","offer_id":46990581629116,"sku":null,"price":29.54,"currency_code":"GBP","in_stock":true},{"title":"5FT \/ Light Yellow","offer_id":46990581661884,"sku":null,"price":29.54,"currency_code":"GBP","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0779\/4714\/2332\/files\/nimble-15ft-waterproof-dog-training-leash---heavy-duty-recall-long-lead-for-large-medium-small-dogs-purple-1_67226f70-a15c-47b3-809e-411eb9e28d0e.jpg?v=1782201852","url":"https:\/\/doggio.co.uk\/products\/nimble-15ft-waterproof-dog-training-leash-heavy-duty-recall-long-lead-for-large-medium-small-dogs-purple","provider":"Doggio","version":"1.0","type":"link"}